Production And Material Planning

Ariston Holding N.V

Nis, RS
On-site
Master production schedule (mps)
Production capacity with demand
Raw material planning strategies
Develop and manage the Master Production Schedule (MPS) to ensure 100% on-time delivery while optimizing factory utilization

Job Summary

  • Develop and manage the Master Production Schedule (MPS) to ensure 100% on-time delivery while optimizing factory utilization.
  • Develop and maintain raw material planning strategies aligned with production schedules and forecasts.
  • Prepare and analyze complex KPI reports (e.g., Plan vs. Actual, OEE “Overall Equipment Effectiveness” support, Inventory Turns, OTIF “On time – In full”).

Matching Summary

Develop and manage the Master Production Schedule (MPS) to ensure 100% on-time delivery while optimizing factory utilization.

Skills & Requirements

Must-have

  • Master Production Schedule (MPS)
  • production capacity with demand
  • raw material planning strategies
  • inventory levels optimization
  • supply chain and logistics coordination
  • ERP systems (SAP, Oracle)

Nice-to-have

  • continuous improvement initiatives
  • Lean, Six Sigma methodologies
  • supplier performance evaluation

Key Requirements

  • VI level vocational education or IV SSS with 5 years experience
  • at least two years in similar or same role
  • English language proficiency
  • computer skills
  • experience in ERP systems

Work Rights

Not specified

Tailored Resume

Cover Letter