The role of the Factory Acceptance Test (FAT) Technician II is to perform shop inspections and testing of TAS equipment prior to shipment
Job Summary
The role of the Factory Acceptance Test (FAT) Technician II is to perform shop inspections and testing of TAS equipment prior to shipment.
This position requires close interface with the Operations Department, Project Engineers and Project Managers, and with other FAT Technicians.
TAS delivers innovative packaged modular systems that are engineered and manufactured in one of our Houston, TX facilities and utilized in data centers, power, and commercial/industrial utility system applications.
Matching Summary
The role of the Factory Acceptance Test (FAT) Technician II is to perform shop inspections and testing of TAS equipment prior to shipment.
Skills & Requirements
Must-have
Mechanical, Electrical, Controls Inspections
PID Walkdown
Electrical Testing
Controls Verifications
HVAC Unit Pre-Energization
Autodesk Construction Cloud
Nice-to-have
Highly Detail Oriented
Problem Solver mindset
Good organizational skills
Entrepreneurial culture
Key Requirements
Ten years or more project field experience
Five years or more managing a team
Experience with ASHRAE, ASME codes
Proficient in understanding schematic drawings
Ability to work with standard controls systems
Proficient in following electrical safety procedures